Fundação Renova

TAC FLORESTA FARM

Published in: 05/31/2019

Signing of the Term of Adjustment of Conduct (TAC) that enables the continuity of the activities of maintenance, control and environmental management at the Floresta Farm. Part of the tailings accumulated at the Risoleta Neves Hydroelectric Power Plant will be taken to the Floresta Farm, a property located in Rio Doce.

Este conteúdo foi útil para você?


Share:

Leave your comment