12/12/2019 SECOND STAGE DECOMMISSIONING OF THE PEQUENO RIVER BARRIER IN LINHARES HAS STARTED Categories: Ações Emergenciais, Emergency Actions
10/11/2019 RENOVA BEGINS CONSTRUCTION OF PEQUENO RIVER COFFERDAM IN LINHARES Categories: Ações Emergenciais, Emergency Actions
07/19/2019 IUCN PANEL PRESENTS THE IMPORTANCE OF NATURAL CONTACT OF WATERS TO THE ECOSYSTEM Categories: doce river panel
06/26/2019 COFFERS ARE INSTALLED IN THE PEQUENO RIVER CANAL IN LINHARES (ES) Categories: Ações Emergenciais, Emergency Actions
03/18/2019 RENOVA FOUNDATION STARTS EVACUATION OF FAMILIES LIVING ON THE BANKS OF THE JUPARANA LAGOON, IN LINHARES (ES) Categories: Ações Emergenciais, Emergency Actions
10/31/2018 JUPARANA LAGOON LEVEL DROPS 1.5 METERS AFTER REOPENING OF THE CANAL AND AREAS NO LONGER FLOODED Categories: Rainy Season
04/05/2018 Renova Foundation opens canal at the Pequeno River barrier in Linhares (ES) to ensure drainage of excess water Categories: Infrastructure Improvement
04/03/2018 Opening of canal at Pequeno River barrier in Linhares (ES) is temporarily postponed Categories: Emergency Actions